1.17.2007 On Rainbow Island, crews installed high strength geosynthetic fabric and fill was placed on top
1.28.2008 Crews work on the demolition of the Route 52 bridge over Rainbow Channel with the newly constructed Route 52 northbound bridge deck on the far left
1.28.2008 Crews work on the demolition of the Route 52 bridge over Rainbow Channel with the newly constructed Route 52 northbound bridge deck on the far right
1.3.2007 STATNAMIC load testing is being performed on the VibroCore concrete shaft on Rainbow Island
10.11.2006 Fill being placed to build temporary wall and ramp adjacent to the existing roadway at Elbow Island
10.30.2006 Installation of coated permanent sheeting black adjacent to the temporary sheeting brown at the barge access area at Garrets Island
10.30.2006 Temporary retaining wall is being constructed to provide material storage and staging area at Garrets Island
12.14.2006 Preparations are being made for the static load test of one of the piles at Rainbow Channel
12.20.2006 Across from the existing Visitor Center on Garretts Island, the fill for the temporary ramp is being graded
2.28.2007 On Rainbow Island, crews installed high strength geosynthetic fabric and fill was placed on top
3.21.2012 The Rainbow Island Fishing north pier has a newly poured deck and decorative light fixtures
5.27.2012 This view is of the high level bridge over Beach Thorofare with the remains of the old structure in the foreground
8.1.2007 Crews install steel reinforcement for the Route 52 southbound pier column on Rainbow Channel
8.2.2006 The field office area is being set up adjacent to Goll Avenue, Shore Road and Somers Point Circle
9.13.2007 Crews work on installing the diaphragm bars on the I-beams on the Route 52 northound bridge
9.25.2007 Crews work on the Route 52 northbound bridge next to the southbound piers on Rainbow Channel